One to seven cores
1–7 core structures organized by system function.

SPACE / SPM / 05
Thermally stable, chemically inert and atomic-oxygen-resistant materials provide reliable 600 Vrms power and low-frequency signals for manned LEO missions, transfer vehicles and optical instruments.

01 / CONFIGURATION DIRECTIONS
These configurations establish a practical discussion starting point. The final product requires a controlled specification based on interface, length, installation and validation conditions.
1–7 core structures organized by system function.
From low-current signal to platform power gauges.
For low-orbit atomic oxygen and wide temperature.
Solution codes support early technical discussions by aligning protocol, construction, link boundaries and application in one view.
MODEL NOTEPage values do not constitute mission qualification or approval. Applicable standards, lot screening and verification levels are confirmed per project.
02 / PERFORMANCE PARAMETERS
The following values describe current product performance boundaries, with the applicable model, construction or test condition retained.
Type SPM cable
Operating range
85 variants
Standard variants
ATOX direction
ESA QPL
Type SPM covers 1–7 cores and 12–32 AWG variants; select the final part number by core count and gauge.
03 / TYPICAL CONSTRUCTION
Material, stranding and plating are selected for resistance, strength, flex and termination.
Dielectric, thermal, vacuum-stability and processing requirements guide material selection.
Single, twisted, shielded, coaxial or multicore signal geometry is formed.
EMI, atomic oxygen, protection and mass are optimized together.
Connector, branch, strain relief, material lot and process records remain controlled.
04 / SELECTION & VALIDATION
LEO, GEO, deep space, launch phase and mission duration
Voltage, current, protocol, frequency, impedance and core count
Mass per meter, diameter, bend radius and route
Vacuum, thermal cycle, radiation, ATOX, vibration and shock
Connector, branch, lacing, ground and installation process
Applicable ESCC/NASA documents, first article, lot and traceability
Page values do not constitute mission qualification or approval. Applicable standards, lot screening and verification levels are confirmed per project.
Ready to define a controlled specification?
Yidong Telecom can build a sample direction and validation matrix around the cable construction, termination and system boundaries.
Submit requirement checklist ↗